Dave is fitting a decorative central strip along the back join and is routing the slot for it.
Photo added on 23/10/2014
The strip is glued in using animal glue.
Photo added on 23/10/2014
The soundhole decoration is fitted and a slot for a tailpiece insert cut in the mahogany front.
Photo added on 23/10/2014
The front is braced and Dave shaping the braces.
Photo added on 23/10/2014
The blocked-up neck is planed for the fingerboard gluing surface and headstock angle.
Photo added on 23/10/2014
Bending the mahogany sides.
Photo added on 23/10/2014
Here Dave is checking the line of the sides in preparation for gluing the back.
Photo added on 23/10/2014
The back is glued on using go-bars.
Photo added on 23/10/2014
Final preparation for finishing.
Photo added on 23/10/2014
Grain filler is applied before the lacquer.
Photo added on 23/10/2014
The first coat is then applied.
Photo added on 23/10/2014
The lacquer must then be flattened prior to polishing.
Photo added on 23/10/2014