The cedar front is joined and then surfaced using a plane.
Photo added on 23/10/2014
Having cut out the shape John is thicknessing the mahogany back, gauging the thickness with calipers.
Photo added on 23/10/2014
John's soundhole decoration involves a series of ebony triangles. These have been prepared and John is here inlaying them into the front.
Photo added on 23/10/2014
Sections of the back strengthening strip are removed to accomodate the back braces.
Photo added on 23/10/2014
The bridge must be perfectly fitted to the slightly curved front prior to gluing.
Photo added on 23/10/2014
John is routing the channel for the truss rod.
Photo added on 23/10/2014
Bending the mahogany sides on an iron.
Photo added on 23/10/2014
With the front, neck and sides assembled the sides are planed to height ready for the linings and back.
Photo added on 23/10/2014
With the fingerboard glued on the neck is reduced to it's final outline.
Photo added on 23/10/2014
John is using a rasp to finalise the heel shape.
Photo added on 23/10/2014
A router is used to create the slot in the bridge for the saddle.
Photo added on 23/10/2014
A final clean up prior to finishing.
Photo added on 23/10/2014